Excavator Long Reach Arms
Mining Machinery Tunnel Excavator Xe400t 40ton Large Digging mining Excavator with best Price
Home

Excavator Tunnel Arm

Mining Machinery Tunnel Excavator Xe400t 40ton Large Digging mining Excavator with best Price

Mining Machinery Tunnel Excavator Xe400t 40ton Large Digging mining Excavator with best Price

Materials:Q355B

Main Parameters

Model New Product
Boom length X M
Arm length X M
Bucket volume/ M ³ 1.5
Counterweight NO NEED

 

  • Item No :

    xe400
  • Payment :

    TT
  • Shipping Port :

    XIAMEN
  • Lead Time :

    30days

EXCAVATOR TUNNEL ARM & BOOM

For a large tunnel excavator, this PC360 is replaced with a super short arm.

The bucket oil cylinder has been added and modified to improve its digging capacity and allow excavation operations in tunnels.

 CONFIGURATION SITUATION

 STEEL CUTTING

The incision is flat to ensure the accuracy of cutting steel plates

 

 GROOVE WELDING

 

Before welding, we have use big edge milling machine mill(taper process) the edge of the sheet. So the welding can go to the internal of the steel-sheet and make the structure have higher performance.

Orbital welding machines are used for welding, and manual strengthening and welding are performed at corners and reinforcements.

Our boom and arm are large-welded box structure and thick or multi-plates for high-stress areas.

Also the inside have strength plate make it more stronger.

 

 LARGE BORING MACHINE -- BUTT BORING

The processing efficiency is higher, the precision is better, and the product quality and labor efficiency are greatly improved.

 

 SURFACE TREATMENT OF WORKPIECE--SHOT BLAST 

The small steel balls of the large shot blasting machine are used to hit the surface of the workpiece to remove the rust and small impurities on the surface of the steel plate, so that the surface of the workpiece presents the original metallic luster and increases the adhesion of the primer.

 

 PRIMER AND PAINT TREATMENTS

Spray with the same paint as the brand excavator factory to ensure consistent color.

 

 HIGH PRESSURE HARD PIPE & PIPELINE BENDING TREATMENT

  

1. Friction welded flange and oil cylinder - use machine high-speed friction welding, which has higher efficiency and avoids artificial false welding and air bubbles.

 

2. Automatic pipe bending machine - use numerical control to control the degree of bending of the pipeline, and automatically bend the seamless steel pipe, with higher precision.

 

 PAINT / PACKAGING / TRANSPORTATION SERVICES

 

1.The color paint is consistent with the brand excavator factory (customizable color), using high-quality paint to make the product more delicate and beautiful.

 

Long Reach Arm and Boom

2. We use stretch film to package the product. (Three-plywood wooden frame needs to be noted)

 

3. We have cooperated with many shipping companies in China for many years,and the transportation service and efficiency are very good. (Recommend FOB/CIF/CNF)

 

 CERTIFICATTES & FACTORY HISTORY

We were originally affiliated to a Singaporean private factory in China. We have always only served the excavator industry and have a lot of data and manufacturing experience. Provide professional excavator accessories for dealers in many countries around the world.We insist on quality first, and deal with details so that brand dealers appoint us as partners.

(Information and photos are not displayed to protect the privacy of customers)

 

Leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Related Products
Komatsu PC360 Excavator arms for tunnel excavation
Komatsu PC360 Excavator arms for tunnel excavation

Materials:Q355B Main Parameters Model PC360 Boom length 5.7 M Arm length 2.9 M Bucket volume/ M ³ 1.5 Counterweight NO NEED

HITACHI ZX70 4.7M tunnel boom For basement excavation
HITACHI ZX70 4.7M tunnel boom For basement excavation

Materials:Q355B Main Parameters Model ZX70 Boom length 2.9 M Arm length 1.75 M Bucket volume/ M ³ 1.5 Counterweight NO NEED

HITACHI ZX70-6A Mini excavator Modified short arm for tunnel construction
HITACHI ZX70-6A Mini excavator Modified short arm for tunnel construction

Materials:Q355B Main Parameters Model ZX70-6A Boom length 2.9 M Arm length 1.75 M Bucket volume/ M ³ 1.5 Counterweight NO NEED

HITACHI ZX120/EX120 Digging bucket cylinder hidden basement construction special design tunnel special excavator arm
HITACHI ZX120/EX120 Digging bucket cylinder hidden basement construction special design tunnel special excavator arm

Materials:Q355B Main Parameters Model ZX120 Boom length 2.9 M Arm length 1.975 M Bucket volume/ M ³ 1200mm width Counterweight NO NEED

SK135sr-YY04 5.37m Hidden bucket cylinder special excavator arm
SK135sr-YY04 5.37m Hidden bucket cylinder special excavator arm

Materials:Q355B Main Parameters Model SK135SR-04 Boom length 3.4 Arm length 1.97 Bucket volume/ M ³ 0.7 Counterweight NO NEED

Short arm excavator with protective steel plate
ZX130-5G Short arm excavator with protective steel plate

Materials:Q355B Main Parameters Model ZX130-5G Boom length 3.2 Arm length 2 Bucket volume/ M ³ 0.7 Counterweight NO NEED

CAT320D original style protective tunnel excavation pole
CAT320D original style protective tunnel excavation pole

Materials:Q355B Main Parameters Model CAT320D Boom length Arm length Bucket volume/ M ³ Counterweight NO NEED

CAT320 solar energy system hydraulic cylinder Piling excavator arm
CAT320 solar energy system hydraulic cylinder Piling excavator arm

Materials:Q355B Main Parameters Model CAT320D Boom length Arm length Bucket volume/ M ³ Counterweight NO NEED

Leave a message

Leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

whatsApp

contact